Wilson Way Bridge Fire Repair
July 17, 2018Job Number: 0118
After a fire had broken out on the Wilson Way Bridge, it was unsafe to drive on. Myers and Sons Construction was tasked with 4 cubic yard of structural concrete repair, 320 square-feet of concrete surface repair, and 120 cubic-feet of unsound concrete repair.