Projects

Tom Paine/ I-5

March 18, 2015

This project was located in San Joaquin County along State Route 5 at various locations from Tom Paine to Route 5/12 Separation.  Construction activities included the treatment of bridge decks, replacing joint seals, approach slabs, cleaning of bridge deck drain systems, rapid set concrete patching and pavement striping.  A total of 175 CY of Rapid Setting Concrete patch was poured across the span of the Tom Paine Bridge.