Myers & Sons was responsible for constructing improvements to the Auburn Trails Water Treatment Facility for the Georgetown Divide Public Utility District (PUD) located in El Dorado County, California. Construction included a new filter building, a raw water pump station, underground utilities, mechanical piping, and electrical components to maintain the facility. The overall design flow rate is 4.5 MGD with a peak design flow rate of 9.0 MGD