Sacramento I-80 Poly
March 18, 2016Categories
Road and Bridge RestorationThis project is located in Sacramento on Route 51 from 0.2 miles north of Oak Park Separation to 0.2 miles south of H Street Undercrossing. The work consists of removal of existing Asphalt surface, removal of unsound concrete, furnish and placement of Polyester Concrete, approach slabs, joints seals and striping.