Place methacrylate and polyester concrete, install new access doors, joint seals, slope paving, joint reconstruction and joint seals.
Interchange Ramps, 4 locations in total
Place methacrylate, Joint Reconstruction, Joint Seals, Approach slabs and bearing pad replacement.
Replace damaged concrete slabs.
Grind Bridge decks, PPC Overlay Bridge Decks, Joint Reconstruction, Joint Seals, HMA Conforms.
Single bridge, placed a PPC leveling course, then installed the final overlay of it including grade corrections and unsound areas repaired with PPC
ISRs
46,000 square yards of Polyester Polymer Bridge Deck Overlay.
Myers & Sons will continue the rehabilitation of the existing 360-foot long by 24-foot wide, six-span, prestressed concrete tee girder bridge. Remove the existing asphalt overlay from the bridge deck,... read more →
Remove and replace 567 cubic yards of structural concrete approach slabs, place 3,211 linear feet of varying joint sizes, furnish and place 295,846 square feet of polyester concrete overlay in... read more →