Repair overside drainage system, shoulder, and embankment.
Saw cutting and diamond grinding to remove the top surface of the bridge deck and approach slabs to provide a smooth (0.2 percent maximum grade break) transition between the existing... read more →
Project would begin at MST’s Marina Transit Exchange at Reservation Road and De Forest Road in the City of Marina (northern terminus), and end at Contra Costa Street in Sand... read more →
The Project improvements include implementing one or two ExpressLanes1 in each direction between I‐405 and I‐605. This Preliminary Drainage Report, in conjunction with the Draft Project Report evaluate two Build... read more →
The project is under construction and consists of Ninyo & Moore | East Garden Grove-Wintersburg Channel, Huntington Beach, California | 211893001 | April 15, 2022the installation of two rows of... read more →
This project consists of 4 bridge rehabs at 3 separate locations, which are all located in region 2, Colorado Springs, El Paso County. The I-25 structure will utilize a polyester... read more →
Const structural conc approach slab, place HMA (Type A), & rdwy exc.
Reinf structural conc bridge, approach slab & polyester conc overlay.
Place polyester concrete overlay, repair spalled surface area.
Polyester concrete overlay on bridge deck and replace joint seal.