Myers and Sons Construction (MSC) in accordance with the project specifications has been contracted by E&B Paving to place approximately 11 cy of Polyester Concrete at a minimum thickness of... read more →
Myers and Sons Construction won this contract through Caltrans as a prime contractor. It was won at $7.7 million with 230 working days. The scope of the work includes bridge... read more →
Myers and Sons Construction was awarded an emergency contract through Caltrans to replace PPC slabs on Route 101 in San Francisco County from 900ft north of Cesar Chavez St UC... read more →
Myers and Sons Construction won this contract through Caltrans as a prime contractor. It was won at $15.9 million with 400 working days. The scope of the work includes replacing... read more →
Myers & Sons Construction in a Joint Venture with JF Shea was awarded this $63 Million Dollar CMGC Preconstruction and Construction contract by Caltrans District 2. The Yreka Rehab Project... read more →
Myers & Sons, in a Joint Venture with Vanguard Construction Inc., is subcontracted to Teichert Construction to provide 25,900 cubic yards of Rapid Setting Lean Concrete Base, 32,900 cubic yards... read more →
The scope of work included treating 79,730 SQFT of bridge decks with methacrylate and replacing 535 linear feet of joint seals and approach slabs across 12 bridges in San Joaquin... read more →
The scope of work included treating 35,477 SQFT of bridge decks with methacrylate and replacing 463 linear feet of joint seals across 15 bridges in Contra Costa County.
Myers & Sons is subcontracted to C.A. Carey Corporation to perform resurfacing of the South 212th Street Bridge over Green River in the city of Kent Washington
The scope of work included treating 11,665 SQFT of bridge decks with methacrylate and replacing 263 linear feet of joint seals across 12 bridges in Solano County.