Clean structural steel; spot blast clean and paint undercoat; ultrasonic testing and weld acceptance; paint structural steel; compile final report; provide traffic control and COZEEP.
Provide Construction Manager General Contractor (CMGC) services (Services) for the Mountain View Transit Center Grade Separation and Access Project (Project). The Agency, subject to Board of Directors' Approval, intends to... read more →
Replace box culvert bridge.
Re-paint structural steel, repair bridge deck and wiring, and perform other work as directed by the engineer.
Repair earthquake damage, traffic control, and other work as required.
Project shall be all-inclusive, from demolition of road surface, removal of guardrails, bridge deck replacement, paving, and guardrail installation.
The Project improvements include implementing one or two ExpressLanes1 in each direction between I‐405 and I‐605. This Preliminary Drainage Report, in conjunction with the Draft Project Report evaluate two Build... read more →
The project is under construction and consists of Ninyo & Moore | East Garden Grove-Wintersburg Channel, Huntington Beach, California | 211893001 | April 15, 2022the installation of two rows of... read more →
This work shall consist of the major concrete, riprap and other structural repairs to I-17-FM. All work other than waterproofing and HMA overlay shall be completed on this structure during... read more →
Removal and disposal of existing asphalt-filled corrugated metal deck, bridge rails, rail transitions, and portions of the existing sheet pile abutments.