The City of Richmond’s Sludge Thickener Project is a major upgrade to the Richmond Municipal Wastewater Treatment Plant, aimed at improving solids handling and operational efficiency. The project included construction... read more →
The Route 50/5 Sacramento Design-Build Project was completed in the summer of 2014 across Sacramento and Yolo Counties. This project focused on critical bridge maintenance for two major structures: the... read more →
The project involves the rehabilitation of two viaducts, including concrete repair, bridge deck overlay, and restoration of barrier rails and expansion joints to improve structural integrity and extend service life.
Project would begin at MST’s Marina Transit Exchange at Reservation Road and De Forest Road in the City of Marina (northern terminus), and end at Contra Costa Street in Sand... read more →
The Project improvements include implementing one or two ExpressLanes1 in each direction between I‐405 and I‐605. This Preliminary Drainage Report, in conjunction with the Draft Project Report evaluate two Build... read more →
The project is under construction and consists of Ninyo & Moore | East Garden Grove-Wintersburg Channel, Huntington Beach, California | 211893001 | April 15, 2022the installation of two rows of... read more →
Pump station, distribution box, 700' of 54" HDPE pipeline.
The project includes installation of standpipes, valves, and fire cabinets along the roadway, as well as a new domestic water line in the plenum to supply potable water from the... read more →
Remove and replace the aging and nonoperational dissolved air floatation thickener (DAFT) Facilities with an efficient, reliable sludge thickener compatible with the plant’s processes.
Lytton Rancheria WWTP is a Progressive design/build project with Myers and Sons and HydroScience Engineers. The project included an aggressive timeline design/build approach. The project provided wastewater for the new... read more →