Lytton Rancheria WWTP is a Progressive design/build project with Myers and Sons and HydroScience Engineers. The project included an aggressive timeline design/build approach. The project provided wastewater for the new... read more →
This is a progressive design-build delivery method Project for the Water Treatment Plant facility for the Lytton Tribe’s community that will consist of about 300 new homes, a community center,... read more →
Subcontracted by Cupertino Electric, Inc. to provide a variety of services including trenching, backfill, forming/rebar/pouring concrete pads, installation of electical vaults, installation of bollards, demolition, and clearing and grubbing for... read more →
Myers & Sons is Subcontracted by Sundt Construction, Inc. to perform sitework and site drainage, and to install water storage tanks, an eductor facility, and biofilter 201 - stormwater &... read more →
Caltrans awarded this CMGC Contract to Myers-Shimmick, A Joint Venture. Pier footing extensions will be constructed for Pier 3 and Pier 4 in the San Gabriel River on three Bridges:... read more →
Myers & Sons was awarded this Caltrans contract to rehabilitate the Saratoga Creek Bridge by constructing a new two span steel girder bridge within the spandrel walls and arch barrels... read more →
The Contra Costa Transportation Authority awarded this CMGC Contract to Myers-Shimmick, A Joint Venture. The project includes a 200 foot-long cable stayed bridge with a single support in the median... read more →
Myers & Sons, in a Joint Venture with R.L. Wadsworth, was granted this contract to Remove talus and install cable net drapery system.
Myers & Sons was awarded a Caltrans Contract for CMGC services for the design and construction of bridge repairs along Route 5 in Siskiyou County.
Design and construction of certain supporting toll system infrastructure, including a toll gantry, power and communication conduits, power supply to the tolling gantry and signs, toll signage, structures for future... read more →